What Concrete Slab Installation Involves in Hamilton, NJ
A slab is the simplest pour on paper, and the one where a skipped step shows up as a door that no longer shuts. Every slab we pour includes the steps below, whether it is a small pad or a garage floor:
- Layout and size fix the footprint and the thickness, and they decide whether a footing is needed under the edges.
- Excavation removes sod and soft soil, which leaves firm ground for the base.
- Stone base is graded and compacted under the slab, so it does not settle under the shed or the unit.
- Forms hold the edges and the level, and they are set with a slight pitch where water has to leave.
- Reinforcement goes in as wire mesh or rebar, which keeps a crack from opening under a load.
- Footings are added under larger slabs, below the frost line, so the edges do not heave.
- The pour is placed and screeded flat in one pass, so the surface has no steps or cold joints.
- Finish is a broom texture or a smooth trowel, chosen for where the slab sits and how it will be used.